Petra Nova Carbon Capture Facility

The journey from suspension to revival
Petra Nova Carbon Capture Facility
Petra Nova Carbon Capture Facility Petra Nova Carbon Capture Facility

Petra Nova Carbon Capture Facility


The journey from suspension to revival

GOAL

Return the world’s largest carbon capture facility to service.

SOLUTION

Develop and execute a plan that ensures Petra Nova is back to operational readiness.

PROJECT
 

Reviving a one-of-a-kind facility

Restarting operations at one of only three utility-scale carbon capture and storage facilities on a power plant in the world.
 

A three-year hiatus


The 2020 COVID-19 pandemic paused activities worldwide and operations at the Petra Nova plant were no exception. The economics of the facility were based on enhanced oil recovery, and when the price for crude oil crashed, operations were suspended until conditions improved. A 2022 fire at WA Parish, Unit 8 that provides flue gas to Petra Nova further delayed operations at the carbon capture facility.

 

With repairs to Unit 8 complete and oil prices recovered, ENEOS Xplora (formerly JX Nippon Oil and Gas Exploration) — a Japanese oil and gas company with a focus on sustainability through carbon capture technologies and the owner of Petra Nova — worked with NRG’s Energy Services team to develop a plan to get the plant up and running again.

 

Now, it is making a comeback.

 

Turning to the experts

Our Energy Services team offers safe solutions backed by decades of expertise and experience. They specialize in operating and maintaining plants while reducing downtime and operating costs by ensuring that units perform better and more reliably. With every plant they operate, our Energy Services team’s goal is to provide solutions tailored to the customer’s unique needs. With a proven track record in plant operations, they went to work returning the pioneering facility to service. Turning to the experts

Our Energy Services team offers safe solutions backed by decades of expertise and experience. They specialize in operating and maintaining plants while reducing downtime and operating costs by ensuring that units perform better and more reliably. With every plant they operate, our Energy Services team’s goal is to provide solutions tailored to the customer’s unique needs. With a proven track record in plant operations, they went to work returning the pioneering facility to service. 

LOCATION
Thompsons, TX

CAPACITY
Designed to capture 90% of CO2 from a 240 MW slipstream of flue gas from a coal-fired generating unit

 

IMPACT
Over 1 million metric tons of greenhouse gas sequestered annuallyIMPACT

 

BUSINESS CASE

The road to restoration


Our Energy Services team started the process of getting Petra Nova back online when operations at the unit were suspended. Energy Services developed and implemented highly comprehensive procedures, checklists, and schedules for long-term layup and preventive maintenance of the shutdown facility equipment.

When asked to restart the unit, Energy Services carefully reviewed the original equipment manufacturer manuals and internal technical guidance to develop a checklist of over 1,500 tasks. Together with the facility staff, and in cooperation with ENEOS Xplora, the team effectively carried out the plan to return all equipment and systems at Petra Nova to operational readiness.

Before: Petra Nova was shut down for just over three years.

After: The plant successfully restarted operations.

Achievement: All systems were tested successfully before returning the facility to service.

1,500+
tasks

completed to ensure operational readiness

Fully operating

at design capacity

ENERGY FACTS

The results of an effective strategy


After completing the plan to get Petra Nova back to service, our Energy Services team and ENEOS Xplora achieved the following:

  • A successful full-speed, no-load test of the cogeneration plant combustion turbine on the first start attempt
  • A first attempt restart of the carbon capture plant was completed without incident
  • A full pressure test of the CO2 transport pipeline proved all systems operational


The Petra Nova project is a valuable example of how carbon capture utilization and storage (CCUS) can be used to reduce emissions from fossil fuel-fired power plants. It’s a positive development for CCUS technology and could help pave the way for wider adoption of this important technology that helps to address climate change.

“There are very few Energy Service teams that have experience operating and maintaining a carbon capture unit the size of Petra Nova, and we’re one of the few.”


Charles Gress
Business Development Director, NRG Energy Services