Dunkirk - Dunkirk, NY

Dunkirk Power LLC, Dunkirk Solid Waste Management Facility, Permit ID 9-0658-00021/00008

Title Document

Post-Closure Plan

GW Monitoring and CA Report 2017

GW Monitoring System Certification

GW Monitoring and CA Report 2019

GW Monitoring and CA Report 2018

Closure Plan

GW Statistical Method Certification

GW Assessment Program Notification

Annual CCR Fugitive Dust Control Report 2017

Location Restrictions Compliance Demonstration

Annual CCR Fugitive Dust Control Report 2018

CCR Fugitive Dust Control Plan

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2019

Landfill Periodic Inspection Report 2017

Run-on and run-off Control System Plan

Landfill Periodic Inspection Report 2018

Landfill Periodic Inspection Report 2019

Landfill Periodic Inspection Report 2016

Significant GW Standard

Notification of Initiation of Assessment of Corrective Measures

Landfill Periodic Inspection Report 2020

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Landfill Periodic Inspection Report 2021

Run-on and run-off Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

GW Monitoring and CA Report 2021

Significant GW Standard Notice—4th QTR 2021

Landfill Periodic Inspection Report 2022

Annual CCR Fugitive Dust Control Report 2022

GW Monitoring and CA Report 2022

Landfill Periodic Inspection Report 2023

Annual CCR Fugitive Dust Control Report 2023

GW Monitoring and CA Report 2023

Landfill Periodic Inspection Report 2024

Annual CCR Fugitive Dust Control Report 2024

GW Monitoring and CA Report 2024

Landfill Periodic Inspection Report 2025

Annual CCR Fugitive Dust Control Report 2025

GW Monitoring and CA Report 2025

Huntley - Tonawanda, NY

Huntley Power LLC, Huntley Solid Waste Management Facility, Permit ID 9-1464-00089/00002

Title Document

Closure Plan

Post-Closure Plan

GW Monitoring and CA Report 2017

GW Monitoring System Certification

GW Monitoring and CA Report 2019

GW Assessment Program Notification

GW Statistical Method Certification

CCR Fugitive Dust Control Plan

Location Restrictions Compliance Demonstration

Annual CCR Fugitive Dust Control Report 2017

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Landfill Periodic Inspection Report 2017

Run-on and run-off Control System Plan

Landfill Periodic Inspection Report 2016

Landfill Periodic Inspection Report 2019

Landfill Periodic Inspection Report 2018

GW Monitoring and CA Report 2018

Significant GW Standard

Landfill Periodic Inspection Report 2020

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Landfill Periodic Inspection Report 2021

Run-on and run-off Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

GW Monitoring and CA Report 2021

Landfill Periodic Inspection Report 2022

Annual CCR Fugitive Dust Control Report 2022

GW Monitoring and CA Report 2022

Landfill Periodic Inspection Report 2023

Annual CCR Fugitive Dust Control Report 2023

GW Monitoring and CA Report 2023

Landfill Periodic Inspection Report 2024

Annual CCR Fugitive Dust Control Report 2024

GW Monitoring and CA Report 2024

Landfill Periodic Inspection Report 2025

Annual CCR Fugitive Dust Control Report 2025

GW Monitoring and CA Report 2025

Huntley - Tonawanda, NY

Huntley Power LLC, South Settling Pond, SPDES Permit No. NY0001023/008

Title Document

GW Monitoring and CA Report 2018

Notification of Initiation of Assessment of Corrective Measures

Significant GW Standard

Liner Design Documentation

Closure Plan

Post-Closure Plan

History of Construction

Initial Structural Stability Assessment

GW Monitoring System Certification

Initial Safety Factor Assessment

Initial Hazard Assessment

GW Monitoring and CA Report 2017

GW Statistical Method Certification

GW Assessment Program Notification

GW Monitoring and CA Report 2019

Notification of Initiation of Assessment of Corrective Measures

Selection of Remedy Progress Report January 2020

Annual CCR Fugitive Dust Control Report 2017

CCR Fugitive Dust Control Plan

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Location Restrictions Compliance Demonstration

Annual CCR Fugitive Dust Control Report 2019

Inflow Design Flood Control System Plan

Impoundment Periodic Inspection Report 2016

Impoundment Periodic Inspection Report 2017

Corrective Measures Assessment Report

Impoundment Periodic Inspection Report 2018

Impoundment Periodic Inspection Report 2019

Selection of Remedy Progress Report August 2020

Impoundment Periodic Inspection Report 2020

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Selection of Remedy Progress Report January 2021

Corrective Measures Assessment Report for Lithium - 2021

Notice of Intent to Close

Selection of Remedy Progress Report August 2021

Impoundment Periodic Inspection Report 2021

Structural Stability Assessment - 2021

Hazard Assessment - 2021

Safety Factor Assessment - 2021

Inflow Design Flood Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

GW Monitoring and CA Report 2021

Selection of Remedy Progress Report January 2022

Selection of Remedy Progress Report July 2022

Impoundment Periodic Inspection Report 2022

Annual CCR Fugitive Dust Control Report 2022

GW Monitoring and CA Report 2022

Selection of Remedy Progress Report January 2023

Selection of Remedy Progress Report July 2023

Impoundment Periodic Inspection Report 2023

Annual CCR Fugitive Dust Control Report 2023

GW Monitoring and CA Report 2023

Selection of Remedy Progress Report January 2024

Selection of Remedy Progress Report July 2024

Closure Plan Amended 2024

Impoundment Periodic Inspection Report 2024

Annual CCR Fugitive Dust Control Report 2024

GW Monitoring and CA Report 2024

Selection of Remedy Progress Report January 2025

Selection of Remedy Progress Report July 2025

Impoundment Periodic Inspection Report 2025

Annual CCR Fugitive Dust Control Report 2025

GW Monitoring and CA Report 2025

Selection of Remedy Progress Report January 2026

Indian River - Dagsboro, DE

Indian River Coal Ash Landfill

Title Document

GW Statistical Method Certification

Location Restrictions Compliance Demonstration

Post-Closure Plan

Closure Plan

GW Monitoring and CA Report 2017

GW Monitoring and CA Report 2018

Annual CCR Fugitive Dust Control Report 2017

CCR Fugitive Dust Control Plan

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

GW Monitoring System Certification

Run-on and run-off Control System Plan

Landfill Periodic Inspection Report 2017

Landfill Periodic Inspection Report 2020

Landfill Periodic Inspection Report 2019

Landfill Periodic Inspection Report 2016

Landfill Periodic Inspection Report 2018

GW Monitoring and CA Report 2019

Annual CCR Fugitive Dust Control Report 2020

Landfill Periodic Inspection Report 2021

GW Monitoring and CA Report 2020

Run-on and run-off Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

Landfill Periodic Inspection Report 2022

GW Monitoring and CA Report 2021

Annual CCR Fugitive Dust Control Report 2022

Landfill Periodic Inspection Report 2023

GW Monitoring and CA Report 2022

Annual CCR Fugitive Dust Control Report 2023

Landfill Periodic Inspection Report 2024

GW Monitoring and CA Report 2023

Annual CCR Fugitive Dust Control Report 2024

Landfill Periodic Inspection Report 2025

GW Monitoring and CA Report 2024

Annual CCR Fugitive Dust Control Report 2025

Landfill Periodic Inspection Report 2026

GW Monitoring and CA Report 2025

Joliet 29 - Joliet, IL

Ash Pond 2 (W1970450047-02)

Title Document

Emergency Action Plan

Closure Plan

GW Monitoring System Certification

GW Statistical Method Certification

CCR Fugitive Dust Control Plan

Initial Structural Stability Assessment

Annual CCR Fugitive Dust Control Report 2016

Initial Safety Factor Assessment

Annual CCR Fugitive Dust Control Report 2017

Location Restrictions Compliance Demonstration

History of Construction

Annual CCR Fugitive Dust Control Report 2019

GW Monitoring and CA Report 2017

Annual CCR Fugitive Dust Control Report 2018

Initial Hazard Assessment

GW Monitoring and CA Report 2018

Inflow Design Flood Control System Plan

Impoundment Periodic Inspection Report 2016

Impoundment Periodic Inspection Report 2017

Impoundment Periodic Inspection Report 2019

Impoundment Periodic Inspection Report 2018

GW Monitoring and CA Report 2019

Impoundment Periodic Inspection Report 2020

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Notice of Intent to Close

Inflow Design Flood Control System Plan - 2021

Hazard Assessment - 2021

Structural Stability Assessment - 2021

Safety Factor Assessment - 2021

Impoundment Periodic Inspection Report 2021

Annual CCR Fugitive Dust Control Report 2021

Emergency Responders Meeting 2021

GW Monitoring and CA Report 2021

Impoundment Periodic Inspection Report 2022

Annual CCR Fugitive Dust Control Report 2022

Emergency Responders Meeting 2022

GW Monitoring and CA Report 2022

CCR Fugitive Dust Control Plan - Updated 2023

Impoundment Periodic Inspection Report 2023

Annual CCR Fugitive Dust Control Report 2023

Emergency Responders Meeting 2023

GW Monitoring and CA Report 2023

Impoundment Periodic Inspection Report 2024

CCR Fugitive Dust Control Plan - Updated 2024

Annual CCR Fugitive Dust Control Report 2024

Emergency Responders Meeting 2024

GW Monitoring and CA Report 2024

Emergency Action Plan - 2025 Update

Impoundment Periodic Inspection Report 2025

Annual Fugitive Dust Control Report - 2025

Emergency Responders Meeting 2025

GW Monitoring and CA Report 2025

Limestone - Jewett, TX

Limestone Unit 003 Secondary E Pond

Title Document

Closure Plan

Liner Design Documentation

Initial Hazard Assessment

Initial Structural Stability Assessment

Initial Safety Factor Assessment

GW Monitoring and CA Report 2017

GW Monitoring System Certification

GW Statistical Method Certification

GM Monitoring System Certification Ameneded

GW Statistical Method Certification Amended

CCR Fugitive Dust Control Plan

History of Construction

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2017

Inflow Design Flood Control System Plan

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Impoundment Periodic Inspection Report 2018

Impoundment Periodic Inspection Report 2017

Impoundment Periodic Inspection Report 2019

Location Restrictions Compliance Demonstration

Impoundment Periodic Inspection Report 2016

Impoundment Periodic Inspection Report 2020

GW Monitoring and CA Report 2018

GW Monitoring and CA Report 2019

Closure Plan Amended 2020

Intent to Close

Closure Plan Amended September 2020

Closure Completion

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Annual CCR Fugitive Dust Control Report 2021

Annual Progress Report - January 2023

Limestone - Jewett, TX

Limestone Unit 004 Landfill

Title Document

Closure Plan

Post-Closure Plan

GW Monitoring and CA Report 2017

GW Statistical Method Certification

GW Monitoring System Certification

GM Monitoring System Certification Ameneded

GW Statistical Method Certification Amended

CCR Fugitive Dust Control Plan

Annual CCR Fugitive Dust Control Report 2017

Location Restrictions Compliance Demonstration

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Run-on and run-off Control System Plan

Annual CCR Fugitive Dust Control Report 2019

Landfill Periodic Inspection Report 2017

Landfill Periodic Inspection Report 2018

Landfill Periodic Inspection Report 2019

GW Monitoring and CA Report 2018

Landfill Periodic Inspection Report 2016

Landfill Periodic Inspection Report 2020

GW Monitoring and CA Report 2019

Closure Plan Amended 2020

Annual CCR Fugitive Dust Control Report 2020

Landfill Periodic Inspection Report 2021

GW Monitoring and CA Report 2020

Run-on and run-off Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

Landfill Periodic Inspection Report 2022

GW Monitoring and CA Report 2021

TCEQ CCR - Registration Application

Run-on and run-off Control System Plan - 2022

Annual CCR Fugitive Dust Control Report 2022

Landfill Periodic Inspection Report 2023

GW Monitoring and CA Report 2022

Annual CCR Fugitive Dust Control Report 2023

Landfill Periodic Inspection Report 2024

GW Monitoring and CA Report 2023

GW Monitoring and CA Report 2023 Revision

Closure Plan Amended 2024

Annual CCR Fugitive Dust Control Report 2024

Landfill Periodic Inspection Report 2025

GW Monitoring and CA Report 2024

GM Monitoring System Certification Amended - 2025

Closure Plan Amended 2025

Annual CCR Fugitive Dust Control Report 2025

Landfill Periodic Inspection Report 2026

GW Monitoring and CA Report 2025

Lincoln Stone Quarry - Joliet, IL

Lincoln Stone Quarry (W1970450046-01)

Title Document

Closure Plan

Post-Closure Plan

GW Monitoring System Certification

GW Monitoring and CA Report 2017

GW Statistical Method Certification

GW Assessment Program Notification

Significant GW Standard

Corrective Measures Assessment Report

Selection of Remedy Progress Report December 2019

Notification of Initiation of Assessment of Corrective Measures

Location Restrictions Compliance Demonstration

GW Monitoring and CA Report 2018

Corrective Measures Assessment Report Public Presentation 082719

Annual CCR Fugitive Dust Control Report 2017

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Inflow Design Flood Control System Plan

GW Monitoring and CA Report 2019

Selection of Remedy Progress Report June 2020

Annual CCR Fugitive Dust Control Report 2020

Selection of Remedy Progress Report December 2020

GW Monitoring and CA Report 2020

Notice of Intent to Close

Selection of Remedy Progress Report June 2021

Inflow Design Flood Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

Selection of Remedy Progress Report December 2021

GW Monitoring and CA Report 2021

Notice of Intent to Close - Revised

Selection of Remedy Progress Report June 2022

Annual CCR Fugitive Dust Control Report 2022

Selection of Remedy Progress Report December 2022

GW Monitoring and CA Report 2022

Selection of Remedy Progress Report June 2023

CCR Fugitive Dust Control Plan - Updated 2023

Annual CCR Fugitive Dust Control Report 2023

Selection of Remedy Progress Report December 2023

GW Monitoring and CA Report 2023

Selection of Remedy Progress Report June 2024

Annual CCR Fugitive Dust Control Report 2024

Selection of Remedy Progress Report December 2024

GW Monitoring and CA Report 2024

Selection of Remedy Progress Report June 2025

Annual Fugitive Dust Control Report - 2025

Selection of Remedy Progress Report December 2025

GW Monitoring and CA Report 2025

Powerton - Pekin, IL

Ash Surge Basin (W1798010008-01)

Title Document

Closure Plan

Initial Hazard Assessment

Initial Safety Factor Assessment

Initial Structural Stability Assessment

GW Monitoring System Certification

GW Statistical Method Certification

GW Assessment Program Notification

GW Monitoring and CA Report 2017

Significant GW Standard

Location Restrictions Compliance Demonstration

GW Monitoring and CA Report 2018

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2017

Annual CCR Fugitive Dust Control Report 2019

History of Construction

Impoundment Periodic Inspection Report 2016

Inflow Design Flood Control System Plan

Impoundment Periodic Inspection Report 2018

Impoundment Periodic Inspection Report 2019

GW Monitoring and CA Report 2019

Impoundment Periodic Inspection Report 2020

Notification for Alternative Closure

Alternative Closure Demonstration

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Supplement to Alternative Closure Demonstration

Impoundment Periodic Inspection Report 2017

Closure Plan Amended 2021

Safety Factor Assessment - 2021

Hazard Assessment - 2021

Structural Stability Assessment - 2021

Inflow Design Flood Control System Plan - 2021

Impoundment Periodic Inspection Report 2021

Closure Plan Amended - October 2021

Annual CCR Fugitive Dust Control Report 2021

Emergency Responders Meeting 2021

Alternate Closure Completeness Letter

GW Monitoring and CA Report 2021

Alternative Closure Progress Update - March 2022

Impoundment Periodic Inspection Report 2022

Annual CCR Fugitive Dust Control Report 2022

Emergency Action Plan - 2022 Update

Emergency Responders Meeting 2022

GW Monitoring and CA Report 2022

Retrofit Plan

Notice of Intent to Retrofit

CCR Fugitive Dust Control Plan - Updated 2023

Impoundment Periodic Inspection Report 2023

Annual CCR Fugitive Dust Control Report 2023

Emergency Responders Meeting 2023

Alternative Closure Progress Update - November 2022

GW Monitoring and CA Report 2023

Impoundment Periodic Inspection Report 2024

Notice of Intent to Close

Notice of Intent to Retrofit - Revised

Alternative Closure Withdrawal

CCR Fugitive Dust Control Plan - Updated 2024

Annual CCR Fugitive Dust Control Report 2024

Emergency Responders Meeting 2024

GW Monitoring and CA Report 2024

Significant Groundwater Standard - 1st Qtr 2025

Notification of Initiation of Assessment of Corrective Measures

Assessment of Corrective Measures Extension Request

Emergency Action Plan - 2025 Update

Assessment of Corrective Measures Extension Approval

Corrective Measures Assessment

Impoundment Periodic Inspection Report 2025

Annual Fugitive Dust Control Report - 2025

Emergency Responders Meeting 2025

Selection of Remedy Progress Report December 2025

GW Monitoring and CA Report 2025

Powerton - Pekin, IL

Bypass Basin (W1798010008-04)

Title Document

Closure Plan

Initial Structural Stability Assessment

Initial Safety Factor Assessment

GW Monitoring System Certification

Initial Hazard Assessment

GW Statistical Method Certification

GW Monitoring and CA Report 2017

GW Assessment Program Notification

Significant GW Standard

Location Restrictions Compliance Demonstration

Annual CCR Fugitive Dust Control Report 2017

GW Monitoring and CA Report 2018

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Impoundment Periodic Inspection Report 2019

Impoundment Periodic Inspection Report 2016

Impoundment Periodic Inspection Report 2018

Inflow Design Flood Control System Plan

2015 Annual Inspection Remedy Report

History of Construction

GW Monitoring and CA Report 2019

Impoundment Periodic Inspection Report 2020

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Notice of Intent to Close

Impoundment Periodic Inspection Report 2017

Closure Plan Amended 2021

Safety Factor Assessment - 2021

Hazard Assessment - 2021

Inflow Design Flood Control System Plan - 2021

Structural Stability Assessment - 2021

Impoundment Periodic Inspection Report 2021

Closure Plan Amended - October 2021

Annual CCR Fugitive Dust Control Report 2021

Emergency Responders Meeting 2021

GW Monitoring and CA Report 2021

Retrofit Plan

Notice of Intent to Retrofit

Impoundment Periodic Inspection Report 2022

Annual CCR Fugitive Dust Control Report 2022

Emergency Action Plan - 2022 Update

Emergency Responders Meeting 2022

GW Monitoring and CA Report 2022

CCR Fugitive Dust Control Plan - Updated 2023

Impoundment Periodic Inspection Report 2023

Annual CCR Fugitive Dust Control Report 2023

Emergency Responders Meeting 2023

GW Monitoring and CA Report 2023

Amended Retrofit Plan - March 2024

Impoundment Periodic Inspection Report 2024

Notification of Retrofit Completion

CCR Fugitive Dust Control Plan - Updated 2024

Annual CCR Fugitive Dust Control Report 2024

Emergency Responders Meeting 2024

GW Monitoring and CA Report 2024

Emergency Action Plan - 2025 Update

Impoundment Periodic Inspection Report 2025

Annual Fugitive Dust Control Report - 2025

Emergency Responders Meeting 2025

GW Monitoring and CA Report 2025

Powerton - Pekin, IL

Former Ash Basin (W1798010008-05)

Title Document

Closure Plan

Notice of Intent to Close

Post-Closure Plan

Closure Plan Amended 2019

History of Construction

Initial Hazard Assessment

Initial Safety Factor Assessment

Initial Structural Stability Assessment

GW Monitoring and CA Report 2018

GW Monitoring System Certification

Annual CCR Fugitive Dust Control Report 2017

GW Statistical Method Certification

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Impoundment Periodic Inspection Report 2018

Inflow Design Flood Control System Plan

Impoundment Periodic Inspection Report 2017

Impoundment Periodic Inspection Report 2019

GW Monitoring and CA Report 2019

GW Assessment Program Notification

Location Restrictions Compliance Demonstration

Impoundment Periodic Inspection Report 2020

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Impoundment Periodic Inspection Report 2021

Safety Factor Assessment - 2021

Hazard Assessment - 2021

Structural Stability Assessment - 2021

Inflow Design Flood Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

Emergency Responders Meeting 2021

Post Closure Plan

GW Monitoring and CA Report 2021

Impoundment Periodic Inspection Report 2022

Closure Plan Amended 2022

Post Closure Plan - November 2022

Annual CCR Fugitive Dust Control Report 2022

Emergency Action Plan - 2022 Update

Emergency Responders Meeting 2022

GW Monitoring and CA Report 2022

Impoundment Periodic Inspection Report 2023

CCR Fugitive Dust Control Plan - Updated 2023

Annual CCR Fugitive Dust Control Report 2023

Emergency Responders Meeting 2023

GW Monitoring and CA Report 2023

Impoundment Periodic Inspection Report 2024

CCR Fugitive Dust Control Plan - Updated 2024

Annual CCR Fugitive Dust Control Report 2024

Emergency Responders Meeting 2024

GW Monitoring and CA Report 2024

Emergency Action Plan - 2025 Update

Impoundment Periodic Inspection Report 2025

Annual Fugitive Dust Control Report - 2025

Emergency Responders Meeting 2025

GW Monitoring and CA Report 2025

Plum Point - Osceola, AR

Plum Point Ash Landfill (0303-S3N)

Title Document

GW Statistical Method Cert

Post-Closure Plan

Closure Plan

CCR Fugitive Dust Control Plan

GW System Cert

GW Monitoring and CA Report 2017

Annual CCR Fugitive Dust Control Report 2017

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Landfill Periodic Inspection Report 2017

Landfill Periodic Inspection Report 2019

Run-on and run-off Control System Plan

Landfill Periodic Inspection Report 2018

Annual CCR Fugitive Dust Control Report 2016

Landfill Periodic Inspection Report 2020

GW Monitoring and CA Report 2018

Landfill Periodic Inspection Report 2016

Location Restrictions Compliance Demonstration

GW Monitoring and CA Report 2019

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Landfill Periodic Inspection Report 2021

Run-on and run-off Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

Landfill Periodic Inspection Report 2022

GW Monitoring and CA Report 2021

Annual CCR Fugitive Dust Control Report 2022

Landfill Periodic Inspection Report 2023

GW Monitoring and CA Report 2022

Annual CCR Fugitive Dust Control Report 2023

Landfill Periodic Inspection Report 2024

GW Monitoring and CA Report 2023

Annual CCR Fugitive Dust Control Report 2024

GW Monitoring and CA Report 2024

Landfill Periodic Inspection Report 2025

Annual CCR Fugitive Dust Control Report 2025

Landfill Periodic Inspection Report 2026

GW Monitoring and CA Report 2025

W.A. Parish - Thompsons, TX

Solid Waste Management Unit 001

Title Document

GW Monitoring System Certification Amended

GW Statistical Method Certification Amended

GW Monitoring System Certification

Annual CCR Fugitive Dust Control Report 2019

GW Statistical Method Certification

Landfill Periodic Inspection Report 2019

Annual CCR Fugitive Dust Control Report 2016

GW Monitoring and CA Report 2017

Annual CCR Fugitive Dust Control Report 2017

Closure Plan

Annual CCR Fugitive Dust Control Report 2018

CCR Fugitive Dust Control Plan

Location Restrictions Compliance Demonstration

Post-Closure Plan

Run-on and run-off Control System Plan

Landfill Periodic Inspection Report 2017

Landfill Periodic Inspection Report 2018

Landfill Periodic Inspection Report 2020

GW Monitoring and CA Report 2018

Landfill Periodic Inspection Report 2016

GW Monitoring and CA Report 2019

Closure Plan Amended 2020

Annual CCR Fugitive Dust Control Report 2020

Landfill Periodic Inspection Report 2021

GW Monitoring and CA Report 2020

Run-on and run-off Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

Landfill Periodic Inspection Report 2022

GW Monitoring and CA Report 2021

CCR Fugitive Dust Control Plan Amended

TCEQ CCR - Registration Application

Run-on and run-off Control System Plan - 2022

Annual CCR Fugitive Dust Control Report 2022

Landfill Periodic Inspection Report 2023

GW Monitoring and CA Report 2022

Annual CCR Fugitive Dust Control Report 2023

Landfill Periodic Inspection Report 2024

GW Monitoring and CA Report 2023

Annual CCR Fugitive Dust Control Report 2024

Landfill Periodic Inspection Report 2025

GW Monitoring and CA Report 2024

Annual CCR Fugitive Dust Control Report 2025

Landfill Periodic Inspection Report 2026

GW Monitoring and CA Report 2025

W.A. Parish - Thompsons, TX

Solid Waste Management Unit 020

Title Document

GW Monitoring System Certification Amended

GW Statistical Method Certification Amended

Closure Plan

Liner Design Documentation

GW Monitoring System Certification

GW Statistical Method Certification

GW Monitoring and CA Report 2017

CCR Fugitive Dust Control Plan

Location Restrictions Compliance Demonstration

Annual CCR Fugitive Dust Control Report 2017

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Inflow Design Flood Control System Plan

Annual CCR Fugitive Dust Control Report 2019

GW Monitoring and CA Report 2018

GW Monitoring and CA Report 2019

Closure Plan Amended 2020

Retrofit Plan

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Notification of Initiation of Retrofit

Inflow Design Flood Control System Plan - 2021

Annual CCR Fugitive Dust Control Report 2021

Liner Certification - Post Retrofit

Notification of Retrofit Completion

GW Monitoring and CA Report 2021

CCR Fugitive Dust Control Plan Amended

TCEQ CCR - Registration Application

Inflow Design Flood Control System Plan - 2022

Annual CCR Fugitive Dust Control Report 2022

GW Monitoring and CA Report 2022

Annual CCR Fugitive Dust Control Report 2023

GW Monitoring and CA Report 2023

Annual CCR Fugitive Dust Control Report 2024

GW Monitoring and CA Report 2024

Annual CCR Fugitive Dust Control Report 2025

Impoundment Periodic Inspection Report 2026

GW Monitoring and CA Report 2025

W.A. Parish - Thompsons, TX

Solid Waste Management Unit 021

Title Document

GW Monitoriing System Certification Amended

GW Statistical Method Certification Amended

Liner Design Documentation

Closure Plan

Initial Hazard Assessment

GW Statistical Method Certification

GW Monitoring System Certification

GW Monitoring and CA Report 2017

CCR Fugitive Dust Control Plan

Annual CCR Fugitive Dust Control Report 2017

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Inflow Design Flood Control System Plan

Location Restrictions Compliance Demonstration

GW Monitoring and CA Report 2018

GW Monitoring and CA Report 2019

Closure Plan Amended 2020

Retrofit Plan

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Notification of Retrofit Completion

Liner Certification - Post Retrofit

Closure Plan Amended 2021

Notification of Initiation of Retrofit

Inflow Design Flood Control System Plan - 2021

Hazard Assessment - 2021

Annual CCR Fugitive Dust Control Report 2021

GW Monitoring and CA Report 2021

CCR Fugitive Dust Control Plan Amended

TCEQ CCR - Registration Application

Inflow Design Flood Control System Plan - 2022

Annual CCR Fugitive Dust Control Report 2022

GW Monitoring and CA Report 2022

Annual CCR Fugitive Dust Control Report 2023

GW Monitoring and CA Report 2023

Annual CCR Fugitive Dust Control Report 2024

GW Monitoring and CA Report 2024

Annual CCR Fugitive Dust Control Report 2025

Impoundment Periodic Inspection Report 2026

GW Monitoring and CA Report 2025

Waukegan - Waukegan, IL

East Ash Pond (W0971900021-01)

Title Document

Closure Plan

GW Monitoring System Certification

Initial Safety Factor Assessment

Initial Structural Stability Assessment

Initial Hazard Assessment

GW Monitoring and CA Report 2017

GW Statistical Method Certification

Location Restrictions Compliance Demonstration

GW Monitoring and CA Report 2018

Annual CCR Fugitive Dust Control Report 2017

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

History of Construction

Annual CCR Fugitive Dust Control Report 2019

Impoundment Periodic Inspection Report 2016

Impoundment Periodic Inspection Report 2017

Impoundment Periodic Inspection Report 2019

Inflow Design Flood Control System Plan

2016 Annual Inspection Remedy Report

Impoundment Periodic Inspection Report 2018

GW Monitoring and CA Report 2019

Impoundment Periodic Inspection Report 2020

Notification for Alternative Closure

Alternative Closure Demonstration

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Supplement to Alternative Closure Demonstration

Post Closure Plan - June 2021

Closure Plan Amended 2021

Structural Stability Assessment - 2021

Inflow Design Flood Control System Plan - 2021

Hazard Assessment - 2021

Safety Factor Assessment - 2021

Impoundment Periodic Inspection Report 2021

Closure Plan Amended - October 2021

Post Closure Plan - October 2021

Annual CCR Fugitive Dust Control Report 2021

Emergency Responders Meeting 2021

Alternate Closure Completeness Letter

GW Monitoring and CA Report 2021

Closure Plan Amended 2022

Alternative Closure Progress Update - March 2022

Impoundment Periodic Inspection Report 2022

Emergency Action Plan - 2022 Update

Annual CCR Fugitive Dust Control Report 2022

Emergency Responders Meeting 2022

GW Monitoring and CA Report 2022

Alternative Closure - Proposed Decision

CCR Fugitive Dust Control Plan - Updated 2023

Impoundment Periodic Inspection Report 2023

Annual CCR Fugitive Dust Control Report 2023

Emergency Responders Meeting 2023

Alternative Closure Progress Update - June 2023

GW Monitoring and CA Report 2023

Notice of Intent to Close

Alternative Closure Withdrawal

Alternative Closure Withdrawal Acceptance

Impoundment Periodic Inspection Report 2024

Annual CCR Fugitive Dust Control Report 2024

Emergency Responders Meeting 2024

GW Monitoring and CA Report 2024

Emergency Action Plan - 2025 Update

GW Assessment Program Notification

Impoundment Periodic Inspection Report 2025

Annual Fugitive Dust Control Report - 2025

Emergency Responders Meeting 2025

GW Monitoring and CA Report 2025

CCR Fugitive Dust Control Plan - Updated 2026

Waukegan - Waukegan, IL

West Ash Pond (W0971900021-02)

Title Document

Closure Plan

GW Monitoring System Certification

GW Statistical Method Certification

Initial Structural Stability Assessment

GW Monitoring and CA Report 2017

Initial Safety Factor Assessment

Location Restrictions Compliance Demonstration

Annual CCR Fugitive Dust Control Report 2017

Initial Hazard Assessment

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Impoundment Periodic Inspection Report 2016

Impoundment Periodic Inspection Report 2018

Inflow Design Flood Control System Plan

Impoundment Periodic Inspection Report 2019

2016 Annual Inspection Remedy Report

Structural Stability Notice of Remedy

GW Monitoring and CA Report 2018

History of Construction

GW Monitoring and CA Report 2019

Impoundment Periodic Inspection Report 2020

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Notice of Intent to Close

Closure Plan Amended 2021

Structural Stability Assessment - 2021

Hazard Assessment - 2021

Inflow Design Flood Control System Plan - 2021

Safety Factor Assessment - 2021

Impoundment Periodic Inspection Report 2021

Impoundment Periodic Inspection Report 2017

Closure Plan Amended - October 2021

Annual CCR Fugitive Dust Control Report 2021

Emergency Responders Meeting 2021

GW Monitoring and CA Report 2021

Closure Plan Amended 2022

Impoundment Periodic Inspection Report 2022

Emergency Action Plan - 2022 Update

Annual CCR Fugitive Dust Control Report 2022

Emergency Responders Meeting 2022

GW Monitoring and CA Report 2022

Alternative Closure - Proposed Decision

CCR Fugitive Dust Control Plan - Updated 2023

Impoundment Periodic Inspection Report 2023

Annual CCR Fugitive Dust Control Report 2023

Emergency Responders Meeting 2023

GW Monitoring and CA Report 2023

Impoundment Periodic Inspection Report 2024

Annual CCR Fugitive Dust Control Report 2024

Emergency Responders Meeting 2024

GW Monitoring and CA Report 2024

Emergency Action Plan - 2025 Update

GW Assessment Program Notification

Impoundment Periodic Inspection Report 2025

Annual Fugitive Dust Control Report - 2025

Emergency Responders Meeting 2025

GW Monitoring and CA Report 2025

CCR Fugitive Dust Control Plan - Updated 2026

Will County - Romeoville, IL

2S (W1978100011-03)

Title Document

Closure Plan Amended 2018

Closure Plan

GW Monitoring and CA Report 2017

GW Monitoring System Certification

GW Monitoring and CA Report 2018

Initial Hazard Assessment

GW Statistical Method Certification

Location Restrictions Compliance Demonstration

Annual CCR Fugitive Dust Control Report 2017

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Inflow Design Flood Control System Plan

GW Monitoring and CA Report 2019

Notification for Alternative Closure

Alternative Closure Demonstration

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Supplement to Alternative Closure Demonstration

Post Closure Plan - June 2021

Closure Plan Amended 2021

Inflow Design Flood Control System Plan - 2021

Hazard Assessment - 2021

Closure Plan Amended - October 2021

Post Closure Plan - October 2021

Annual CCR Fugitive Dust Control Report 2021

Emergency Responders Meeting 2021

Alternate Closure Completeness Letter

GW Monitoring and CA Report 2021

Alternative Closure Progress Update - March 2022

GW Assessment Program Notification

Annual CCR Fugitive Dust Control Report 2022

Emergency Responders Meeting 2022

Notice of Intent to Close

Significant Groundwater Standard - 2022

GW Monitoring and CA Report 2022

Notification of Initiation of Assessment of Corrective Measures

Alternative Closure Withdrawal

Closure Plan Amended 2023

Post Closure Plan - 2023

Corrective Measures Assessment Report

Selection of Remedy Progress Report June 2023

CCR Fugitive Dust Control Plan - Updated 2023

Emergency Action Plan

Annual CCR Fugitive Dust Control Report 2023

Emergency Responders Meeting 2023

Selection of Remedy Progress Report December 2023

GW Monitoring and CA Report 2023

Selection of Remedy Progress Report June 2024

Annual CCR Fugitive Dust Control Report 2024

Emergency Responders Meeting 2024

Selection of Remedy Progress Report December 2024

GW Monitoring and CA Report 2024

Emergency Action Plan - 2025 Update

Selection of Remedy Progress Report June 2025

Annual Fugitive Dust Control Report - 2025

Emergency Responders Meeting 2025

Selection of Remedy Progress Report December 2025

GW Monitoring and CA Report 2025

Will County - Romeoville, IL

3S (W1978100011-04)

Title Document

Closure Plan

Closure Plan Amended 2018

GW Monitoring and CA Report 2017

Initial Hazard Assessment

GW Monitoring and CA Report 2018

GW Monitoring System Certification

GW Statistical Method Certification

Location Restrictions Compliance Demonstration

Annual CCR Fugitive Dust Control Report 2017

Annual CCR Fugitive Dust Control Report 2016

Annual CCR Fugitive Dust Control Report 2018

Annual CCR Fugitive Dust Control Report 2019

Inflow Design Flood Control System Plan

GW Monitoring and CA Report 2019

Annual CCR Fugitive Dust Control Report 2020

GW Monitoring and CA Report 2020

Notice of Intent to Close

Closure Plan Amended 2021

Inflow Design Flood Control System Plan - 2021

Hazard Assessment - 2021

Closure Plan Amended - October 2021

Post Closure Plan - October 2021

Annual CCR Fugitive Dust Control Report 2021

Emergency Responders Meeting 2021

GW Monitoring and CA Report 2021

Annual CCR Fugitive Dust Control Report 2022

Emergency Responders Meeting 2022

Significant Groundwater Standard - 2022

GW Monitoring and CA Report 2022

Notification of Initiation of Assessment of Corrective Measures

Closure Plan Amended 2023

Post Closure Plan - 2023

Corrective Measures Assessment Report

Selection of Remedy Progress Report June 2023

CCR Fugitive Dust Control Plan - Updated 2023

Emergency Action Plan

Annual CCR Fugitive Dust Control Report 2023

Emergency Responders Meeting 2023

Selection of Remedy Progress Report December 2023

GW Monitoring and CA Report 2023

Selection of Remedy Progress Report June 2024

Annual CCR Fugitive Dust Control Report 2024

Emergency Responders Meeting 2024

Selection of Remedy Progress Report December 2024

GW Monitoring and CA Report 2024

Emergency Action Plan - 2025 Update

Selection of Remedy Progress Report June 2025

Annual Fugitive Dust Control Report - 2025

Emergency Responders Meeting 2025

Selection of Remedy Progress Report December 2025

GW Monitoring and CA Report 2025

ELG Rule Compliance Data and Information

Powerton - Pekin, IL

Title Document

Notice of Planned Participation - Permanent Cessation of Coal

Annual Progress Report - 2022

Annual Progress Report - 2023

Annual Progress Report - 2024

Annual Progress Report - 2025

Annual Progress Report - 2025 revised

Qualifying Event - Initial Certification

ELG Rule Compliance Data and Information

Waukegan - Waukegan, IL

Title Document

Notice of Planned Participation - Permanent Cessation of Coal

Annual Progress Report - 2022

ELG Rule Compliance Data and Information

Will County - Romeoville, IL

Title Document

Notice of Planned Participation - Permanent Cessation of Coal

Annual Progress Report - 2022

ELG Rule Compliance Data and Information

Indian River - Dagsboro, DE

Title Document

Notice of Planned Participation - Permanent Cessation of Coal

Annual Progress Report - 2022

Annual Progress Report - 2023

Annual Progress Report - 2024

Notice of Planned Participation - Permanent Cessation of Coal - 2025

Annual Progress Report - 2025

ELG Rule Compliance Data and Information

Limestone - Jewett, TX

Title Document

Notice of Planned Participation - Permanent Cessation of Coal

Annual Progress Report - 2022

Annual Progress Report - 2023

Notice of Planned Participation - Permanent Cessation of Coal - Withdrawal

ELG Rule Compliance Data and Information

W.A. Parish - Thompsons, TX

Title Document

Notice of Planned Participation - Permanent Cessation of Coal

Annual Progress Report - 2022

Annual Progress Report - January 2023

Annual Progress Report - 2023

Notice of Planned Participation - Permanent Cessation of Coal - Withdrawal

STAGE